CASE STUDY 3
(London Waste Ltd -
ongoing)
- Safety – Cleaning is carried out via 2 manholes; previously this could only be achieved by abseiling, followed by manual cleaning
- Efficiency – The internal surfaces are cleaned back to the metal; the fallen material is then removed from the access door at the base of the FGT equipment
- Time savings – the core intervention lasts around 2 hours; manual cleaning used to be much more time consuming; no scaffolding is required by KRR